Road Infrastructure
CREMAF Ruta 5
The project and our contribution
Within the CVU tender for the Public Works Contract for the design, construction, rehabilitation, maintenance, and financing of the road infrastructure of Ruta 5 between chainages 69K000 and 95K200, the Executive Project was developed for the components of Roadworks, Stormwater Drainage, and Signage and Barriers.
EnginLabs was hired by the Lemiro Pablo Pietroboni - Berkes consortium, in charge of executing the works. The section of the project is located between chainage 69k000 and the junction with National Route No. 56 at the access to the city of Florida. The alignment passes through the towns of Mendoza and Mendoza Chico and connects with National Routes No. 76 and No. 12.
The project duplicates Ruta 5 and includes two bridges along its route, four lower pedestrian passages, wildlife crossings, roundabouts, and returns.