Road Infrastructure
Ruta 14
The project and our contribution
With the purpose of improving circulation conditions and load capacity on Ruta 14, pavement rehabilitation works are planned, proposing the construction of a new structural package with an asphalt wearing course, platform widening works to improve carriageway and shoulder widths, as well as planimetric and altimetric modifications to increase the design speed of the route.
The study section has a total length of 74 km and is composed of a 27 km sub-section, from Lascano toward the East under departmental jurisdiction, while the remaining 47 km up to the connection with Ruta 9 are under national jurisdiction.
EnginLabs carried out the roadworks, earthworks, signage, and road safety projects, together with the consultancy DICA, responsible for stormwater drainage projects and bridge hydraulics. In January 2026 the works on the national section began, carried out by the company Traxpalco.